Project Description

Refurbishment of office space on the third floor at 150 Cheapside London.

Works entailed removal of partition walls and reinstatement of a new office environment.

We also refurbished a kitchen area, re-sized a comms room complete with electrical and mechanical alterations, made sprinkler system modifications, ductwork modifications and general redecoration throughout.

As the building was occupied throughout the works all furniture was protected throughout to ensure a seamless progression.