Project Description
Fit out of newly constructed cross laminated timber frame structure including the design of the mechanical and electrical systems.
This project presented new challenges for Strata, not only did we have the day to day site operations to take into consideration, but also the logistics of working on a pier 140m from the shore line. With weight restrictions, excess wind speeds, rain and spray from the sea the site team had their work cut out!
The project was to install a light weight floating floor with built in underfloor heating served by a housed Air Source Heat pump. Construction of shared use public toilets clad with decorative pholinic film plywood. A retail kitchen area and roof terrace kiosk. Bespoke shop area with units constructed from Tilly board to compliment the CLT structure.
As part of the work we also under took the design and construction of the warm roof and raised roof terrace allowing visitors to enjoy the coastal views.